1. Before starting, check whether the mechanism is a warehouse door. It is strictly forbidden to open the door during the operation of the machine to prevent danger.
2. The crusher must be started empty and will only be produced after normal operation.
3. According to the requirements of the particle size of the materials, the conference has caused equipment damage and low output.
4. When the abnormal interruption result indicates, stop the inspection, solve the problem, and then use it for production.
5. Add lubricant regularly and rotate bearing parts.
https://www.stordworkshop.com/




